20.03.13
Waha Oil Company has awarded a contract to Zulal Water Technology (ZWT) as they will carry out three turnkey reverse osmosis water plants for the Gialo, Waha and Essider oil camps.
Announcing the multi-million dinar contract today, Tripoli-based ZWT said that the project would be completed during the fourth quarter of the year as Waha Oil wanted the plants to be commissioned as soon as possible.
The total capacity of the three proposed Zulal plants exceeds 4,000 cubic metres a day.
ZWT were selected on the basis of the strength within their technical proposal and their ability to install high quality water plants in a short time frame, which they demonstrated when installing an emergency water plant for the company recently.
(Source: Libya Herald)